Five-Year Housing Land Supply Explained (2026 NPPF)

How five-year housing land supply is calculated under the 2026 NPPF, what counts as deliverable, and why a council shortfall can open the door to planning permission.

PLANNING POLICY

Andrew Ransome

11/2/20266 min read

5 year land supply
5 year land supply

Few planning numbers matter more to landowners and developers than a council's five-year housing land supply.

When a council cannot show enough deliverable housing land for the next five years, national policy treats that as evidence of an unmet need for housing. Sites that would otherwise be refused can then become acceptable in principle.

The August 2026 National Planning Policy Framework (NPPF) changed both how the five-year supply is calculated and what happens when a council falls short.

The old "tilted balance" has gone.

In its place is a new set of location-based policies, in which a supply shortfall is one of several routes to permission for housing outside settlements.

This guide explains how the five-year supply works now, and what a shortfall means for your site.

What Is the Five-Year Housing Land Supply?

Every local planning authority must identify, and update each year, a supply of specific deliverable sites sufficient to provide at least five years' worth of housing.

The calculation has three parts:

  1. The requirement: how many homes the council needs to provide over five years

  2. The buffer: an additional percentage brought forward from later in the plan period

  3. The supply: the number of homes on deliverable sites expected to be built in the five-year period

The supply is then expressed in years. For example, a council with exactly enough deliverable land has a 5.0-year supply. One with only half the land it needs has 2.5 years.

What Is the Requirement Measured Against?

The starting point is the housing requirement in the council's adopted development plan.

However, Annex D says that where the plan's housing requirement is more than five years old, supply is measured against the council's local housing need, calculated using the Government's standard method.

This matters because the standard method was revised in December 2024.

For many councils, the result is far higher than the requirement in their adopted plans.

Once those plans pass their fifth anniversary, the five-year supply is tested against the higher figure, and many councils fall short.

The Buffer: 5% or 20%

Annex D of the NPPF requires a buffer to be added to the five-year requirement:

  • 5%: the standard buffer, to ensure choice and competition in the market for land

  • 20%: where the Housing Delivery Test shows delivery below 85% of the requirement over the previous three years

  • 20% (for decision-making only): where the council's housing requirement was adopted in the last five years and examined under a version of the NPPF published before December 2024, and the annual requirement is 80% or less of current local housing need. The same applies where the requirement is more than five years old but the policies have been reviewed and found not to need updating.

The third category catches councils that adopted plans with relatively low housing requirements shortly before the national figures rose. For them, a recently adopted plan does not guarantee a robust land supply position.

What Counts as a "Deliverable" Site?

The supply side of the calculation is where most disputes arise.

The NPPF glossary says a site is deliverable if it is available now, offers a suitable location for development now, and is achievable with a realistic prospect that homes will be delivered within five years. It then distinguishes two types of site:

  • Smaller sites with planning permission, and all sites with detailed permission: these are considered deliverable until the permission expires, unless there is clear evidence that homes will not be built within five years

  • Sites with outline permission for major development, allocations, permission in principle, or brownfield register entries: these should only be counted where there is clear evidence that homes will be delivered on site within five years

Councils frequently include large allocations and outline permissions in their supply on the strength of optimistic trajectories.

Testing that evidence site by site is often what turns a claimed five-year supply into a shortfall.

Questions include whether a developer is on board, whether reserved matters have been submitted, and whether infrastructure or nutrient neutrality issues are holding things up.

The Housing Delivery Test

Alongside the five-year supply, the Government publishes Housing Delivery Test results every year. They measure how many homes were actually built over the previous three years against the number required. The consequences under Annex D are:

  • Delivery below 95%: the council must prepare an action plan

  • Delivery below 85%: a 20% buffer applies to the five-year supply

  • Delivery below 75%: an evidenced unmet need for housing is deemed to exist for the purposes of policy S5(1)(j)

The consequences apply from the day after the results are published and remain in place until the next results come out. The latest results were published on 17 August 2026, the same day as the new NPPF.

Why the Five-Year Supply Matters Under the 2026 NPPF

Under the previous Framework, a supply shortfall triggered the "tilted balance". The 2026 NPPF replaced this with a presumption in favour of sustainable development that works by location.

Within settlements, policy S4 already supports development unless the benefits would be substantially outweighed by adverse effects. The five-year supply makes little difference to the principle.

Outside settlements, policy S5 allows only certain forms of development. One of them, S5(1)(j), is development that would address an evidenced unmet need.

The NPPF expressly includes housing where the council cannot demonstrate a five-year supply, or scores below 75% in the latest Housing Delivery Test. To qualify, the development must also:

  • be physically well-related to an existing settlement; and

  • be of a scale that can be accommodated, taking account of the existing or proposed availability of infrastructure.

Where those conditions are met, the proposal should be approved unless the benefits would be substantially outweighed by any adverse effects.

My guide to getting planning permission outside a settlement boundary explains how this works in practice.

Two further points are important:

  • Unmet need is not limited to land supply. The NPPF says an evidenced unmet need includes, but is not limited to, a five-year supply shortfall. Evidence of unmet need for affordable housing, older people's housing or self-build plots may also qualify, even where a council has a five-year supply.

  • Green Belt is different. Policy S5 does not apply in the Green Belt. A supply shortfall can still help show the unmet need required under the grey belt policies. See my guide to grey belt land.

Protection for Recently Adopted Plans

Annex A of the NPPF gives councils with recently adopted plans some protection. For five years from adoption, if a council can demonstrate a five-year supply with the appropriate buffer, and its Housing Delivery Test result is above 75%, the fact that local housing need is higher than the adopted requirement should not itself be treated as evidence of unmet need.

This protection falls away as soon as either condition fails.

It also does not prevent a council being caught by the 20% buffer for pre-December 2024 plans described above.

How to Check Your Council's Position

Most councils publish their five-year supply in an annual housing land supply statement or as part of their Authority Monitoring Report. These usually use a base date of 1 April. Other useful sources include:

  • recent appeal decisions, where inspectors often reach their own conclusions on the supply

  • the Government's annual Housing Delivery Test results

  • committee reports on major applications, which usually state the current position

Treat the council's published figure as a starting point rather than the final word.

Inspectors regularly find a lower figure once the deliverability of individual sites has been tested.

Five-Year Supply in Practice

In Thurrock, I secured permission in principle for four dwellings on grey belt land. Part of the case was Thurrock's housing land supply of just 1.02 years.

You can browse more examples on my planning appeal wins page.

Planning Advice on Housing Land Supply

Five-year supply arguments are technical and frequently contested. I assess councils' supply positions, and use the results to support planning applications and appeals for housing. If you own land on the edge of a settlement, or a site in the Green Belt, and your council is short of housing land, get in touch for an initial conversation.

Andrew Ransome MRTPI - Email: andrew@andrewransome.co.uk

About me

Andrew Ransome is a Planning Director and a Chartered Member of the Royal Town Planning Institute (RTPI), with more than two decades of experience in town planning.

He specialises in delivering strategic planning solutions for complex developments across both rural and urban environments, helping clients navigate planning challenges and unlock development opportunities. Connect with Andrew on Linkedin.

Planning Policy Information

Recent Planning Approvals

Andrew Ransome RTPI
Andrew Ransome RTPI

Get in Touch

Email: andrew@andrewransome.co.uk

Tel: 020 7096 8045

London Office:

60 Tottenham Court Road

Fitzrovia

London

W1T 2EW

© 2026 Andrew Ransome Town Planning Ltd. All rights reserved.

Content on this website is provided for general information and educational purposes only and does not constitute formal planning, professional, or legal advice. Planning policies, legislation, and guidance are subject to change. Site-specific assessment by a qualified consultant is recommended before making development decisions.

Projects highlighted across this website represent professional work undertaken by Andrew Ransome throughout his career.

Andrew Ransome Town Planning Ltd - Registered in England and Wales. Company Registration No. 17489935. Registered Office: Office 2059, 60 Tottenham Court Road, Fitzrovia, London, W1T 2EW