The 2025 Housing Delivery Test Explained

The Housing Delivery Test explained: how it works, and how the 2025 results affect every council, and why a score below 75% can open the door to planning permission.

PLANNING POLICY

Andrew Ransome

11/3/20265 min read

2025 housing delivery test explained
2025 housing delivery test explained

The Housing Delivery Test measures how many homes have actually been built in each council's area against the number that were needed.

It is published by the Government each year.

For landowners and developers, the result can be as important as a council's five-year housing land supply. A score below 75% means national policy deems there to be an unmet need for housing, and that can make development outside settlements acceptable in principle.

The 2025 results were published on 17 August 2026, the same day as the new National Planning Policy Framework (NPPF). This guide explains how the test works, what the consequences are, and what the latest results show.

What Does the Housing Delivery Test Measure?

The test compares two figures over the previous three financial years. For the 2025 measurement, those years are 2022/23, 2023/24 and 2024/25.

Homes required. For councils with an up-to-date plan, this is the lower of the housing requirement in the adopted plan and local housing need, for each year.

Where the plan's housing requirement is five years old or more and has not been reviewed, the council is measured against local housing need.

London boroughs without an up-to-date local plan are measured against the London Plan figure.

Homes delivered. This is the net number of additional homes, using national statistics on net additional dwellings.

Student and other communal accommodation is converted into equivalent homes: student bedrooms are divided by 2.4, and other communal bedrooms by 1.9.

The result is homes delivered divided by homes required, expressed as a percentage. The detailed method is set out in the Housing Delivery Test rule book and the technical note published with the results.

What Are the Consequences?

Annex D of the NPPF sets out three thresholds:

  • Below 95%: the council should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery

  • Below 85%: a 20% buffer is added to the council's five-year housing land supply requirement, in addition to the action plan

  • Below 75%: an evidenced unmet need for housing is deemed to exist for the purpose of applying policy S5(1)(j), in addition to the action plan and 20% buffer

The consequences apply from the day after the results are published.

They remain in place until the next set of results is published. If a council adopts a new housing requirement between publications, its result may be recalculated.

Why a Score Below 75% Matters

Under the August 2026 NPPF, the presumption in favour of sustainable development depends on whether a site is inside or outside a settlement.

Outside settlements, policy S5 allows only certain types of development.

One category, S5(1)(j), is development that would address an evidenced unmet need. That includes housing where the council cannot demonstrate a five-year supply or scores below 75% in the Housing Delivery Test.

A score below 75% is significant for three reasons:

  • It is a published fact, not an argument. A council's five-year supply is often contested at appeal, site by site. A Housing Delivery Test result is published by the Government and is not open to debate in the same way.

  • It applies regardless of the five-year supply. A council with a healthy land supply on paper can still have a deemed unmet need if its actual delivery has been poor.

  • It removes the protection for recent plans. Annex A of the NPPF protects councils with plans adopted in the last five years from local housing need being treated as unmet need, but only where the council passes the Housing Delivery Test at above 75%.

Qualifying for S5(1)(j) does not guarantee permission.

The development must still be physically well-related to an existing settlement and of a scale that infrastructure can accommodate.

The proposal should then be approved unless the benefits would be substantially outweighed by adverse effects.

In the Green Belt, policy S5 does not apply. A Housing Delivery Test result below 75% can still be relevant to showing the unmet need required under the grey belt policies. See my guide to grey belt land.

The 2025 Housing Delivery Test Results

Across England the results were:

  • 93 councils (31%) score below 75%, meaning an evidenced unmet need is deemed to exist

  • 19 score between 75% and 84%, so a 20% buffer and action plan apply

  • 35 score between 85% and 94%, so an action plan is required

  • 154 score 95% or more, so no consequences apply

The lowest results in England are the City of London (4%), Castle Point (11%), Portsmouth (11%), Southend-on-Sea (20%), Basildon (23%) and Eastbourne (23%).

Essex, Kent and London

Essex Focus (14 councils)

  • Below 75% (5): Basildon, Castle Point, Epping Forest, Southend-on-Sea, Thurrock

  • 20% buffer, 75–84%: none

  • Action plan only, 85–94% (1): Harlow

My Essex five-year housing land supply guide sets out the result for each Essex council alongside its latest five-year supply position.

Kent Focus (12 districts and Medway)

  • Below 75% (7): Folkestone and Hythe, Gravesham, Medway, Sevenoaks, Swale, Thanet, Tonbridge and Malling

  • 20% buffer, 75–84% (2): Ashford, Canterbury

  • Action plan only, 85–94% (2): Maidstone, Tunbridge Wells

London (32 boroughs and the City)

  • Below 75% (21): Barking and Dagenham, Brent, Bromley, Camden, City of London, Ealing, Greenwich, Hackney, Haringey, Havering, Hillingdon, Islington, Kingston upon Thames, Lambeth, Lewisham, Merton, Newham, Redbridge, Richmond upon Thames, Southwark, Tower Hamlets

  • 20% buffer, 75–84% (5): Enfield, Hounslow, Kensington and Chelsea, Sutton, Waltham Forest

  • Action plan only, 85–94% (2): Bexley, Hammersmith and Fulham

The Old Oak and Park Royal Development Corporation in west London also scores below 75% (58%). The London Legacy Development Corporation is no longer scored separately; its figures are included within the relevant boroughs.

How to Use the Results

  1. Check your council's result

  2. Below 75%? Focus on whether your site is physically well-related to a settlement and whether infrastructure can accommodate the scale proposed. See my guide to planning permission outside a settlement boundary.

  3. Between 75% and 84%? The 20% buffer makes a five-year supply harder to demonstrate. Test the council's latest supply statement.

  4. 95% or above? The five-year supply becomes the key question, along with any other evidence of unmet need, such as for affordable housing, older people's housing or self-build plots.

  5. Watch for the next results. Consequences change from the day after each annual publication. A council's position can improve or worsen, so the timing of an application or appeal can matter.

Planning Advice on Housing Delivery and Land Supply

I use Housing Delivery Test results and five-year supply evidence to support planning applications and planning appeals for new homes.

For example, In Thurrock, which scores 29% in the 2025 test, I secured permission in principle for four dwellings on grey belt land, where the borough's housing shortfall was central to the case.

If your council is failing to deliver the homes it needs and you own land with potential, get in touch for an initial conversation.

Andrew Ransome MRTPI - Email: andrew@andrewransome.co.uk

About me

Andrew Ransome is a Planning Director and a Chartered Member of the Royal Town Planning Institute (RTPI), with more than two decades of experience in town planning.

He specialises in delivering strategic planning solutions for complex developments across both rural and urban environments, helping clients navigate planning challenges and unlock development opportunities. Connect with Andrew on Linkedin.

Planning Policy Information

Recent Planning Approvals

Andrew Ransome RTPI
Andrew Ransome RTPI

Get in Touch

Email: andrew@andrewransome.co.uk

Tel: 020 7096 8045

London Office:

60 Tottenham Court Road

Fitzrovia

London

W1T 2EW

© 2026 Andrew Ransome Town Planning Ltd. All rights reserved.

Content on this website is provided for general information and educational purposes only and does not constitute formal planning, professional, or legal advice. Planning policies, legislation, and guidance are subject to change. Site-specific assessment by a qualified consultant is recommended before making development decisions.

Projects highlighted across this website represent professional work undertaken by Andrew Ransome throughout his career.

Andrew Ransome Town Planning Ltd - Registered in England and Wales. Company Registration No. 17489935. Registered Office: Office 2059, 60 Tottenham Court Road, Fitzrovia, London, W1T 2EW